Board Meeting Reminder

Hi Challenger Park Townhome Residents,

This is a reminder that our Challenger Park HOA board meeting is scheduled for January 18th, 2022 6:00 PM. This meeting will be held virtually through Zoom. 

The board of directors will be discussing 2021 financials and 2022 maintenance that will be completed.

Please join if you have questions for the Board or would like to listen in on affairs within the community.

~

Topic: Challenger Park Townhome Board of Directors Meeting
Time: Jan 18, 2022 06:00 PM Mountain Time (US and Canada)
Join Zoom Meeting
https://us06web.zoom.us/j/83466960897?pwd=dTBvNDErWWd4N01UdlJYbGE3K04vdz09
Meeting ID: 834 6696 0897
Passcode: 127762

Board Meeting Reminder Read More »

Annual Board Meeting November 16, 2021 6:00 p.m.

Hi Challenger Park Townhome Residents,

This is a reminder that our Challenger Park HOA annual board meeting is scheduled for November 16th, 2021 06:00 PM. This meeting will be held at South East Christian Church.

The annual meeting will include voting for a board member position, the 22′ budget, 22′ dues increase and other relevant topics our community faces.

The Board encourages all homeowners to attend the annual meeting as a quorum of home owners or paper proxy votes or Docusign electronic proxy votes must be sent in to complete voting for a new board member and the 22′ budget. If a quorum isn’t met at the Nov 16th meeting, a second annual meeting will be scheduled.

Annual Board Meeting November 16, 2021 6:00 p.m. Read More »

Board Meeting Reminder September 21, 2021

Hi Challenger Park Townhome Residents,

This is a reminder that our Challenger Park HOA board meeting is scheduled for September 21, 2021 06:00 PM. This meeting will be held virtually through Zoom.

This meeting is optional for homeowners but it is a good place to get informed on what’s going on in the community.

The board of directors will be discussing the 2022 budget, potential due increases, maintenance and other HOA topics at this meeting.

~

Topic: Challenger Park Townhomes
Time: Sep 21, 2021 06:00 PM Mountain Time (US and Canada)
Join Zoom Meeting
https://us06web.zoom.us/j/86769574674?pwd=Q2gxZkpFbmlncXR0Mlp2d2ZrM1JRQT09
Meeting ID: 867 6957 4674
Passcode: 467898
One tap mobile
+12532158782,,86769574674#,,,,467898# US (Tacoma) +13462487799,,86769574674#,,,,467898# US (Houston)

Sincerely,
 

Your Board of Directors.

Board Meeting Reminder September 21, 2021 Read More »

Challenger Park Townhome Garage Sale – August 14th

The Challenger Park governing documents allow for an annual garage sale. 

The annual garage sale is scheduled on National Garage Sale Day, August 14th 8:00 a.m. to 3:00 p.m.

The Board of Directors requests that garage sale displays be set up in front of the owner’s garages, rather than in the open space (to minimize damage to the grass).

There will not be any towing enforcement scheduled on Saturday to accommodate for garage sale activity in the parking lots.

The HOA will be providing a ‘roll away’ dumpster for residents to dispose of unwanted larger items that don’t fit in the regular trash bins. The roll away dumpster will be located toward the South side of the community on the main drive.

Challenger Park Townhome Garage Sale – August 14th Read More »

Finalized Traffic Plan for Parking Lot Replacement August 19th

Hello Challenger Park Townhome Residents,

The finalized dates and traffic plans for re-paving the South two parking lots are as follows:

Night of the 8/18: Residents living in both of the South quads must park their vehicles in either the South-East Christian Church parking lot or the North quads of Challenger Park.

Thursday 8/19: Asphalt milling will occur. No vehicle access to South side garages. Our vendor expects to start construction at 7:30 a.m., vehicles parked in garages will not be permitted to leave during construction.

Friday 8/20: Asphalt patching will occur. No vehicle access to South side garages during construction. After construction hours cars will be able to park in parking spots (there will not be painted parking spots) and garages will be accessible by vehicles. Our vendor expects to start construction at 7:30 a.m., vehicles parked in garages will not be permitted to leave during construction.

Saturday 8/21: No construction will occur, normal traffic and parking. Normal vehicle garage access.

Sunday 8/22: No construction will occur. Normal vehicle access during the day. Sunday night, residents living in the South West quad must park their vehicles in either the South-East Christian Church parking lot or the North quads of Challenger Park Townhomes. Normal parking and garage access to the South East quad – no construction will occur on the South East quad.

Monday 8/23: Asphalt paving will occur on the South West parking lot, no vehicle access to the South West garages. Our vendor expects to start construction at 7:30 a.m., vehicles parked in garages will not be permitted to leave during construction.

Tuesday 8/24: Asphalt paving will occur on the South East parking lot, no vehicle access to the South East garages. P.M. access to South West garages returns to normal. Asphalt in the South West will be drying/settling, no parking or vehicle garage access in the South West quad. Our vendor expects to start construction at 7:30 a.m., vehicles parked in garages will not be permitted to leave during construction.

Wednesday 8/25: P.M. access to South East garages returns to normal.

There are plans to seal coat the asphalt along the main drive that will occur a few weeks out from the date of this project. There will be limited access during the seal coating of the main drive during this time. Dates and a finalized traffic plan will be announced at a later date.

Sorry for any inconveniences caused by the necessary road repair. 

Sincerely,

Challenger Park Townhomes Board of Directors

Finalized Traffic Plan for Parking Lot Replacement August 19th Read More »

South Parking Lot Replacement Scheduled for August 19th

Hi Challenger Park Townhome Residents,

On August 19th, we have scheduled milling and re-paving scheduled for the South two parking lots.

Access in and out of the South side of the parking lot and South side garages will not be available on August 19th. Residents who live on the South side of the complex will need to park their vehicles at South East Christian Church’s parking lot or the North side of the Challenger Park complex on August 18th.

Residents who live on the North side of the complex won’t have interruption to traffic patterns on August 18th aside from construction traffic.

Notices will be posted and final traffic plans will be shared on August 10th after final review from the asphalt vendor.

~

North parking lots are scheduled to be replaced Spring/Summer 22′.

Sincerely,
 

Your Board of Directors.

South Parking Lot Replacement Scheduled for August 19th Read More »